This 6m Joskin trailing shoe from Tramspread has been adapted for umbilical work after starting life on a tanker.


Equipped with 21cm spaced coulters positioned at 15°, flow meters allow the operator to control how much slurry is being applied.

The multi-action shoe coulter system are good for dry conditions, say the company and the £13,750 machine needs about 100hp to pull it.

• For more from Muck North West click here