Slurry storage top of agenda

SLURRY STORAGE may be the last thing on farmers’ minds when expanding herd size, but one Cheshire producer says it should be the first thing considered.


Betley, Crewe-based Paul Moore says the impact on slurry storage and its disposal would be his primary concern in any expansion plans for his 200-cow herd.


He told producers at a Forward Farming initiative open-day at The Grange that the unit produced more manure than could be safely spread on the 205ha (492 acres) in the vicinity of the unit. The area receives 47,953kg of nitrogen a year.


“We have to spread slurry on land away from the farm, and farm staff have an accurate system of recording, so we know exactly what has been spread and where. But we are still learning,” said Mr Moore.


He told visitors that 10 years ago he was not worried about turning a field black with slurry in autumn. “That is a thing of the past. Now when we leave a field after spreading we leave a green field.”


The farm has four months’ slurry storage. “We can use a weeping wall in the slurry pit, which is useful for some, but not all of the time.”


Up to 250kg/ha of total nitrogen from organic manure can be applied over a 12-month period. Figures prepared by The Dairy Group for The Grange showed a weeping wall would contain 2kg/cu m of nitrogen enabling up to 125 cu m/ha to be applied to any field in a 12-month period.


“We try to accurately measure how much nitrogen we are applying with each 11,000-litre tank load of slurry and apply it to the most important grass growing areas at the optimum time for uptake, the spring.


“But we don”t apply any slurry to grass within eight weeks of our mid-May silaging time.” Dribble-bars improve the ability to deliver an even cover of slurry, as well as placing it at root level and keeping it off plants.


“The most nerve racking part of all this hinges on future expansion. Many producers feel they will have to expand to produce more litres to stay in business. Those extra litres mean more muck, so any future expansion plans here would start by working backwards. We would start thinking about how we would cope with the waste and work that back to see how many cows we could put on instead of the other way round.”