Stay focused on customers when buying equipment
INTRODUCING LARGER, high capacity equipment or new techniques and systems to customers is not always easy. A good working relationship with customers and a degree of understanding of what they hope to achieve from a contractor”s services are essential.
Get it wrong and the business will suffer, as customers are likely to migrate to those who are prepared to listen, communicate and problem solve. Get it right and business efficiency can move forward in leaps and bounds.
Chris Bishop of Bucks-based CG Bishop Agricultural Contractors found himself in a similar dilemma when reviewing the firm”s mowing outfit last season.
“We had been using a John Deere front and rear combination on a Fendt tractor, putting 6m of grass into one swath. We wanted to increase our output and decided the best way to do it was by switching to a triple mower system on a 190hp JCB Fastrac,” he explains.
“We talked to customers about what we were looking to achieve and all were in agreement with what we wanted to do, which was to improve our silage making efficiency.”
Mr Bishop”s logic was straightforward enough – in lighter second- and third-cut crops, he needed to put three swaths into one to help load-up his 500hp Claas Jaguar 890 forager.
Given that the firm was using a two-into-one swath system, there would be less running around at high speeds in the field and a general overall improvement in efficiency at no extra cost to the customer.
“I didn”t want to start raking up rows – it is far better to use the mowers to create a smooth, dense swath,” he says.
“We would have to charge 4/acre on top of our 41/acre silage charge for rowing up, but worse than that, raking pulls unwanted foreign bodies into the swath.”
Financially, this means the forager”s blades, shear bar and grindstone – with a replacement cost of about 750 – would last barely 404ha (1000 acres) instead of the 1400ha (3460 acres) he achieves by not rowing up.
On paper, the triple mower system offered a high degree of operational flexibility and swath placement.
“The system could produce single swaths, put two into one and put three into one,” he says. “It seemed ideal for customers who needed more wilt or wanted to ted, but in heavy first cut crops we could also stay with two swaths into one.”
But reality proved somewhat different, he says.
“Having what was really a pre-production prototype mowing rig caused a few headaches,” he says. “The swath belt system wouldn”t give us the flexibility we”d hoped for, so our options were single swaths or three into one.
“We explained the problem and gave customers the choice of single or triple swaths and offered to rake up single swaths at no extra cost to get around the problem.
“Under the circumstances, good communication with our customers resulted in almost all being happy for us to run a three-into-one system.”